Petropavlovsk

Projects

We carry out reconstruction and repair projects of heat power equipment at CHP-2. We also carry out heating networks reconstruction.

Turbo generator at st.No. 5 with a 90 MW total capacity, boiler unit at st. No. 6, 7, 8, 12 with a capacity of 1080 tons of steam per hour were reconstructed and put into operation at the Petropavlovsk CHP-2 in 2005.

We carry out the following projects:

+7 (7172) 249-422 office@saem.kz